![Tokyo Keiki UFP-20 Скачать руководство пользователя страница 123](http://html1.mh-extra.com/html/tokyo-keiki/ufp-20/ufp-20_installation-and-operation-manual_1125190123.webp)
1-112
4C-d. Rewrap
Rewrap the paper around the pipe at the intended flow measure point.
Fig. 1.2.9-61 Fix gauge paper
4C-e. Extend the line
Using a pencil or marking pen, mark the pipe at both edges of the paper at the overlap and at
the crease by using a pencil or marking pen to extend the lines outward from the paper onto
the pipe.
Fig. 1.2.9-62 Mark the extend lines
(1)
(2)
Adhesive tape
Crease
Extend Marking Line
Extend Marking Line
Required F-Dist
Adjust both edges
Fix gauge paper
using adhesive tape.
Содержание UFP-20
Страница 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Страница 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Страница 8: ...1 Installation ...
Страница 9: ......
Страница 17: ......
Страница 18: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 130: ...2 Operation ...
Страница 131: ......
Страница 182: ...3 Other ...
Страница 183: ......
Страница 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...
Страница 195: ...3 10 1 Adaptor A 2 Adaptor B 3 Knob Fig 3 2 4 5 Fixture 1 Fig 3 2 4 6 Fixture 2 Fig 3 2 4 7 Z path method adaptor ...
Страница 196: ...3 11 4 Large Transducer Kit Fig 3 2 4 9 Fixture 1 Fig 3 2 4 10 Fixture 2 Fig 3 2 4 8 Large transducer ...