1-92
3-c. Attach Z-path method adaptor
1.Set adaptor B onto the slide of
down side. Slide knob will fix
adaptor position.
Please install it on the direction
of which the mark of “-50mm”
comes to the scale side.
2. Adaptor B expansion 3. Wrong example
(opposite direction)
4. Attach adaptor A on the other side of
the pipe.
Adaptor B
Flow
1
Slide knob
DN side slide
Scale
Mark of
“
-50mm
”
Adaptor B
2
Mark of
“
-50mm
”
Scale
3
Mark of “-50mm”
Scale
Flow
Adaptor B
Bolt
4
Содержание UFP-20
Страница 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Страница 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Страница 8: ...1 Installation ...
Страница 9: ......
Страница 17: ......
Страница 18: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 130: ...2 Operation ...
Страница 131: ......
Страница 182: ...3 Other ...
Страница 183: ......
Страница 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...
Страница 195: ...3 10 1 Adaptor A 2 Adaptor B 3 Knob Fig 3 2 4 5 Fixture 1 Fig 3 2 4 6 Fixture 2 Fig 3 2 4 7 Z path method adaptor ...
Страница 196: ...3 11 4 Large Transducer Kit Fig 3 2 4 9 Fixture 1 Fig 3 2 4 10 Fixture 2 Fig 3 2 4 8 Large transducer ...