1-109
1. Connection to the transducer side
2. Connection to the main unit side
Fig. 1.2.9-55 Connect the transducer cables
4B-j. Let’s start measurement
Finished prepare to measurement. Push
O K
key as Fig.1.2.9-53 (1) to start measurement
(mounting information menu).
Fig. 1.2.9-56 Setup is completed
・
Please pay attention to burr of chains, corner of mounting fixtures etc, not to be injured.
・
Please be noted that it may contain popssibility to drop mouting fixture off.
Caution
1
Insert connector
to be straight.
UP1(Green)
(Upstream)
DN1(Red)
(Downstream)
2
Содержание UFP-20
Страница 1: ...Doc No KF08 002L Portable Ultrasonic Flowmeter UFP 20 Installation Operation Manual ...
Страница 3: ... 2 The attachment of warning label is as follows Fig 1 2 Rear view of main unit Warning label ...
Страница 8: ...1 Installation ...
Страница 9: ......
Страница 17: ......
Страница 18: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 130: ...2 Operation ...
Страница 131: ......
Страница 182: ...3 Other ...
Страница 183: ......
Страница 193: ...3 8 3 2 4 Dimensions 1 Main Unit Fig 3 2 4 1 Main Unit Hand Strap ...
Страница 195: ...3 10 1 Adaptor A 2 Adaptor B 3 Knob Fig 3 2 4 5 Fixture 1 Fig 3 2 4 6 Fixture 2 Fig 3 2 4 7 Z path method adaptor ...
Страница 196: ...3 11 4 Large Transducer Kit Fig 3 2 4 9 Fixture 1 Fig 3 2 4 10 Fixture 2 Fig 3 2 4 8 Large transducer ...