Injection Molding Machine Chapter 5
V3.0
5-11
Content of Alarm
Cause of Alarm
Release of Alarm
28.
Total parts count over
Please check part shot
count & setting
S
/
A
: Product counting
exceeded
1.
Open safety gate
2.
Reset product counter
29.
Control panel temp.
too HI./LOW
Please check control
panel. Temperature &
cooling it down less 50
℃
M
/
S
/
A
: temperature inside
control box exceeds
65 degree or in
negative
temperature
1. O
pen safety gate
2. I
mprove temperature
condition inside control box
3. TP board +20
,
C wire
breaking
30.
Mould dose not open
end (not end)
Please open the mould
at open end position
M
: clamp open/close position
is not at end position
before barrel cleaning
1. O
pen safety door
2.
Clamp must be open before
cleaning barrel
3
1. Purge cover be open
Please check purge
cover & input no. 210
M
/
S
/
A
: I/O 210 OFF
1.
Open safety gate
2.
Close nozzle cover
3. Check limit switch
32. Parts
not pass
(confirmation)
Please check parts &
input no.122
S
/
A
: When T/C 326 starts
time counting I/O 122
OFF
1.
Open safety gate
2.
Check product pick-out
device
33. Heater t
emperature
ready
Please open the door
and close to reset
alarm
M:
Temperature reaches to
set value and T/C 42-
cold material start
protection time
completed.
1.
Open safety gate
34. Function not selected
Please check this
function is it enable!
M
: function selection not
performed before
operation of manual
button
1.
Open safety gate
2. Select
this
function
Содержание TMC 1000E
Страница 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Страница 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Страница 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Страница 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Страница 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Страница 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Страница 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Страница 148: ...Injection Molding Machine Appendix A A 3 V3 0 1 3 CARRIAGE ADVANCE If CARRIAGE MOVEMENT ON then CARRIAGE ADVANCE ...
Страница 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Страница 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Страница 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Страница 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Страница 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Страница 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Страница 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Страница 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...
Страница 168: ...Injection Molding Machine Appendix C C 0 V3 0 Appendix C Robot Connection 1 Signal Definition C 1 2 Wiring Example C 2 ...