Injection Molding Machine Chapter 6
V3.0
6-2
2 Periodical inspections
2.1 Daily inspection items
★
Press emergency stop button to check whether or not PUMP/MOTOR stops immediately.
★
Open and close safety gate to check whether or not I/O 101
,
103 have on/off.
★
Open and close safety gate to check whether or not drop bar can operate smoothly.
★
Check the barrel guard for security.
★
Check all moving parts for good lubrication.
★
Check hydraulic oil and lubrication oil for sufficiency.
★
Check cold start protection time
,
dangerous temperature setting for being proper.
★
Check collar temperature
,
hydraulic oil temperature for being proper.
★
Check hydraulic pump for abnormal noise.
★
Check operation of various parts for any abnormality or looseness.
★
Check hydraulic hoses for looseness or oil leakage.
★
Expelling air in hydraulic system.
★C
heck machine grounding wire for being proper
★
Check mold fixing screw for security.
★
Check mold protection device for normality.
2.2 Monthly inspection items
★
Inspect and clean filters of hydraulic system.
★
Check of hydraulic system for oil leakage.
★
Inspect and clean the oil cooler.
★
Check all moving parts for looseness.
★
Check and clean dust and dirt in the control cabinet.
★
Check and clean off the plastic particles on the barrel.
★
Test proportional pressure /flow of hydraulic system for correctness.
★
Cleaning thermocouples and adjust contact tightness.
★
Waste oil handling
2.3 Half-year inspection items
★
Check parallelism of platens.
★
Change hydraulic oil.
★
Check screw/barrel unit for leakage or back flow.
★
Adjust mounting pads and level machine base.
Содержание TMC 1000E
Страница 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Страница 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Страница 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Страница 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Страница 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Страница 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Страница 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Страница 148: ...Injection Molding Machine Appendix A A 3 V3 0 1 3 CARRIAGE ADVANCE If CARRIAGE MOVEMENT ON then CARRIAGE ADVANCE ...
Страница 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Страница 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Страница 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Страница 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Страница 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Страница 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Страница 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Страница 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...
Страница 168: ...Injection Molding Machine Appendix C C 0 V3 0 Appendix C Robot Connection 1 Signal Definition C 1 2 Wiring Example C 2 ...