Injection Molding Machine Chapter 0
0-2
V3.0
5. Adjusting of mounting pad………………………..………………………………………….. 3-7
6.Ventilation……………………………………..……………………………………………….. 3-8
7. Preparation before operation………………………………………………………………….. 3-9
7.1 Power supply ....................................................................................................................... 3-9
7.2 Cooling water ...................................................................................................................... 3-10
7.3 Main power/water connection position ............................................................................... 3-10
7.4 Material ............................................................................................................................... 3-10
7.5 Hydraulic oil, lubrication oil and grease ............................................................................. 3-11
7.6 Operating temperature and humidity .................................................................................. 3-11
8. Pre-operation checkpoints…………………………………………………………………….. 3-12
4.1 Check before power ON...................................................................................................... 3-12
4.2 Check before motor starting................................................................................................ 3-12
4.3 Motor starting inspection .................................................................................................... 3-12
4.4 Check the mold condition ................................................................................................... 3-14
Chapter 4: Operation
1. Operation panel………………………………………………………………………………... 4-1
1.1 Screen /function selection key ............................................................................................ 4-1
1.2 Number/alphabet key.......................................................................................................... 4-1
1.3 Direction/screen operation instruction key......................................................................... 4-1
1.4 Manual operation switch ..................................................................................................... 4-1
2. Screen layout and operation…………………………………………………………………… 4-3
2.0 Main page of operation screen............................................................................................ 4-5
2.1 Main page of operation screen............................................................................................ 4-7
2.2 Machine monitoring screen ................................................................................................ 4-8
2.3 Clamp open/close setting.................................................................................................... 4-9
2.4 Clamping parameters .......................................................................................................... 4-11
2.5 Ejector setting ..................................................................................................................... 4-13
2.6 Ejector parameter................................................................................................................ 4-15
2.7 Corepull setting................................................................................................................... 4-17
2.8 Corepull parameters............................................................................................................ 4-19
2.9 Injection setting .................................................................................................................. 4-20
2.10 Injection parameters........................................................................................................... 4-22
2.11 Injection closed loop control .............................................................................................. 4-24
2.12 Charge/Carriage setting ..................................................................................................... 4-26
2.13 Charge/Carriage parameters .............................................................................................. 4-28
2.14 Temperature setting ........................................................................................................... 4-30
2.15 Temperature parameters .................................................................................................... 4-31
2.16 Molding data store…….………………………………………………………………... 4-33
2.17 SPC data …………………………………………………………………………………. 4-34
Содержание TMC 1000E
Страница 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Страница 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Страница 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Страница 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Страница 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Страница 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Страница 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Страница 148: ...Injection Molding Machine Appendix A A 3 V3 0 1 3 CARRIAGE ADVANCE If CARRIAGE MOVEMENT ON then CARRIAGE ADVANCE ...
Страница 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Страница 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Страница 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Страница 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Страница 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Страница 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Страница 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Страница 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...
Страница 168: ...Injection Molding Machine Appendix C C 0 V3 0 Appendix C Robot Connection 1 Signal Definition C 1 2 Wiring Example C 2 ...