Injection Molding Machine Chapter 4
V3.0
4-38
2.19 Production management
On EJECTION
,
INJECTION or CHARGE screen press F8 PROD. MANG.
,
or use the
direction key to move the cursor to PROD. MANAGEMENT
,
press ENTER to display this
screen.
V1: 0/ 0
0/ 0
V2:
0/ 0
P1: 0/ 0
P2:
100.0mm
50.0mm
110.0mm
1.0mm
ACTION STATUS
M:
03D05M07Y
10h25m10s
20°C
3W
F2
F1
F3
F4
F5
F6
F7
F8
STATISTIC
LOG
START
MENU
28
STOP
DATA
CLEAR
CHANGE
MOLD
SUPPORT
PROD.
PROD.
MANAG.
MOLD NO.
MOLD NAME
CAVITY
BAD PARTS ALLOW
PRESET TOTAL
LOT COUNT
PACKING SIGNAL
CYCLE T.
PRODUCT START T.
GOOD PARTS
BAD PARTS
PRODUCT END T.
TMC-150
10
< 10>
< 10> 1
<999999> 10000
< 10000> 200
< 2.0> 0.0
< 20.0> 20.0
01M 21D 10h 00m
1000
01M 21D 09h 00m
01M 20D 10h 10m
PROD.
END
A
B
C
D
MODIFY
DATE
2007-12-21
MODIFY
ESTIMATE PRODUCT
END T.
0
E
Screen 4-23
A
BAD PARTS
:
When cushion monitor function is on
,
and the continuous defective parts
judged by cushion monitor is over BAD PARTS setting
,
alarm is fired.
B
PRESET TOTAL
:
When total production parts counter is reached
,
alarm is fired and
machine will stop production.
C
LOT COUNT
:
When counter is over
,
alarm is fired but machine will continue production
during alarm period.
D
PACKING SIGNAL
:
when LOT COUNT is reached
,
the time for alarm is determined by
packing signal value
E
F3 STOP STATISTIC
:
pressing F3 will suspend statistics
,
e.g.
,
counting of number of
products produced shall be suspended.
Содержание TMC 1000E
Страница 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Страница 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Страница 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Страница 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Страница 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Страница 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Страница 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Страница 148: ...Injection Molding Machine Appendix A A 3 V3 0 1 3 CARRIAGE ADVANCE If CARRIAGE MOVEMENT ON then CARRIAGE ADVANCE ...
Страница 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Страница 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Страница 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Страница 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Страница 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Страница 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Страница 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Страница 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...
Страница 168: ...Injection Molding Machine Appendix C C 0 V3 0 Appendix C Robot Connection 1 Signal Definition C 1 2 Wiring Example C 2 ...