Injection Molding Machine Chapter 6
V3.0
6-0
Chapter 6: Maintenance
1. Safety device inspection………….……… 6-1
1.1 Electrical safety..................................... 6-1
1.2 Hydraulic safety .................................... 6-1
1.3 Mechanical safety ................................. 6-1
2. Periodical inspections……………………. 6-2
2.1 Daily inspection items........................... 6-2
2.2 Monthly inspection items...................... 6-2
2.3 Half-year inspection items .................... 6-2
2.4 Maintenance and check chart................ 6-3
3. Cleaning…………………………………. 6-5
3.1 Screw removal/installation and
cleaning .................................................
6-5
3.2 Barrel removal/ installation and
cleaning .................................................
6-6
3.3 Hopper window glass replacement ....... 6-6
3.4 Cooler removal/installation and
cleaning .................................................
6-7
3.5 Filter removal/installation and cleaning 6-7
3.6 Water distributor removal/installation
and cleaning ..........................................
6-8
4. Lubrication………………………………. 6-9
4.1 Toggle system lubrication..................... 6-9
4.2 Grease lubrication ................................. 6-10
4.3 Lubrication points and timing ............... 6-11
4.4 Lubrication for die height adjustment
gear……………………………………
6-12
5. Spare parts………………………………. 6-13
Содержание TMC 1000E
Страница 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Страница 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Страница 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Страница 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Страница 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Страница 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Страница 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Страница 148: ...Injection Molding Machine Appendix A A 3 V3 0 1 3 CARRIAGE ADVANCE If CARRIAGE MOVEMENT ON then CARRIAGE ADVANCE ...
Страница 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Страница 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Страница 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Страница 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Страница 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Страница 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Страница 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Страница 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...
Страница 168: ...Injection Molding Machine Appendix C C 0 V3 0 Appendix C Robot Connection 1 Signal Definition C 1 2 Wiring Example C 2 ...