97
SC-F70
SC-F70
PID Operation Operating Instructions
Actions
Analysis
∑
If the voltage reading is about
0V, the wire between the
controller and the pressure
transmitter is broken.
Repair the wiring.
∑
If the voltage reading is about
-
19~
-
23V, the wires between
the controller and the pressure
transmitter are connected
backward.
Change the wiring for correct
polarity.
∑
For other cases, go to the next
step.
∑
If the measured value is
adequate, clean the
measurement tube to make sure
there is no accumulation of dirt.
∑
If the measured value is
inadequate, replace the pressure
transmitter or the wires to it.
∑
If the measured value is not
stable, check the signal wire
shielding and the controller
grounding.
4. Measure the DC voltage between the
+
terminal and
the
-
terminal of the pressure transmitter, and
confirm that the voltage reading is about 19~23V.
5. Remove the pressure transmitter from the
measurement tube, and measure the sensor signal
under atomospheric pressure.
Measurement Range of
Pressure Sensor
0 ~ 2000 kPa G
DC 1V
0 ~
500 kPa G
DC 1V
0 ~
400 kPa abs
DC 3V
Sensor Output
Take the actions in the right column depending on the
measurement results.