24 |
P a g e
Tigo Energy, Inc.
|
www.tigoenergy.com
|
DC conductors
3.
Prepare two conductors (10-8AWG) and route
through the BAT-INV conduit (
5
).
a.
Use a crimping tool to crimp a
wire ferrule (
D
)
to the end of each
conductor.
4.
Verify the BAT-switch is in the OFF position
5.
Insert the BAT-INV conductors into the terminals of
BAT+
and
BAT-
.
Communication cable
6.
Route the CAT5/6 communication cable through the INV-communications conduit (
7
).
a.
Use an RJ-45 crimping tool to crimp an RJ-45 connector at each end of the CAT5/6.
Reference
Table 4
for wiring standards
T568A and T568B.
7.
Insert the RJ-45 connector into the
INV
COM
port.
8.
Once complete, replace the wire box covers and torque the screw to 1Nm.
Figure 31 Inverter connection preparation
Figure 32 Conductor preparation
Figure 33 BAT output label
Figure 34 INV-COM label