Fault state 

Leaf 

Red light flashes (1 second on, 1 second off) 

Ring 

Power ≤25%, LED B1 is on, LED B2/3/4 are off

 

Power ≤50%, LED B1/2 are on, LED B3/4 are off

 

Power ≤75%, LED B1/2/3 are on, LED B4 are off

 

Power >75%, LED B1/2/3/4 are on 

Upgrade state 

Leaf 

Yellow light flashes (1 second on, 1 second off) 

Ring 

Power ≤25%, LED B1 is on, LED B2/3/4 are off

 

Power ≤50%, LED B1/2 are on, LED B3/4 are off

 

Power ≤75%, LED B1/2/3 are on, LED B4 are off

 

Power >75%, LED B1/2/3/4 are on 

Manual forced 

power ON 

Leaf 

Green light flashes (0.1 second on, 0.1 second off) 

Ring 

Power ≤25%, LED B1 is on, LED B2/3/4 are off

 

Power ≤50%, LED B1/2 are on, LED B3/4 are off

 

Power ≤75%, LED B1/2/3 are on, LED B4 are off

 

Power >75%, LED B1/2/3/4 are on 

Manual forced 

OFF 

Leaf 

Red light flashing (0.1 second on, 0.1 second off) 

Ring 

Power ≤25%, LED B1 is on, LED B2/3/4 are off

 

Power ≤50%, LED B1/2 are on, LED B3/4 are off

 

Power ≤75%, LED B1/2/3 are on, LED B4 are off

 

Power >75%, LED B1/2/3/4 are on 

 

Powering Off the EI Solution 

 

 

CAUTION 

 Risk of Shock and burns! 

Wait 5 minutes after complete system shutdown has been initiated before 

servicing the battery. Always wear appropriate PPE when servicing the 

system. 

 

Ensure the battery shutdown command is sent from the EI mobile 

app. The app command prevents the inverter from entering backup 

mode. 

 

Power off battery system after the inverter has shut down.  

 

Shut down grid, PV, and battery completely. 

 

1.

 

Open the EI App 

and send the “System Shutdown” command.

 

2.

 

Open/turn off the AC disconnect switch between inverter and the service entrance. 

3.

 

Open/turn off the DC disconnect switch at the bottom of the inverter. 

4.

 

Power off the battery 

 

 

Содержание TSB-10-US

Страница 1: ...1 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Tigo Energy Intelligence Tigo Energy Intelligence Battery Storage Installation and Operation Manual 002 00085 00 10 22 2021...

Страница 2: ...R MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF TIGO THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Страница 3: ...age Contents 9 Tools Items Needed for Installation 10 EI Battery Overview 10 EI Battery Labels 11 EI Battery Weight and Dimensions 12 Selecting the Installation Location 12 Installation requirements 1...

Страница 4: ...Powering on the EI Solution 26 LED Status 27 Powering Off the EI Solution 28 Forced start shutdown 29 After Installation 30 Cleaning and Care 30 Maintenance 30 Troubleshooting 30 Your Tigo Customer Su...

Страница 5: ...t entra ner la mort ou des blessures graves CAUTION indicates a hazardous situation which if not avoided could result in minor or moderate injury and damage to the product ATTENTION indique une situat...

Страница 6: ...ancer For more information refer to www P65Warnings ca gov Caution This product must operate within the technical specifications of the datasheet Damage caused by failure to follow the contents of the...

Страница 7: ...evel monitoring rapid shutdown and best in class module level optimization with Tigo s patented Predictive IV 3 EI Battery optional The LFP battery is designed for use specifically with the EI Inverte...

Страница 8: ...and reasonably weather tight To store the battery enclosure select a dry environment with ambient temperatures of 4 F to 113 F 20 C 45 C Understanding this Document This manual includes installation r...

Страница 9: ...or any product damage and or missing parts EI Battery Package Contents Open the package and inspect the contents The following components should be included If anything is missing please contact the v...

Страница 10: ...rill 8mm drill bit Drilling pilot holes for mounting Bit size will depend on the mounting surface material and anchor sizes required EI Battery Overview Left side Front Right side Back Figure 3 Batter...

Страница 11: ...gure 4 Specifications label Figure 5 Safety label Certifications Tigo EI App The battery enclosure has a wire box door on each side The inverter connection wire box 8 includes two labels specifying th...

Страница 12: ...re 8 Battery enclosure dimensions Selecting the Installation Location The EI Battery enclosure s Inverter connection wire box 8 is on the left Consider the conduit path between the left side of the EI...

Страница 13: ...n structures constructed of highly flammable materials The humidity at the installation location must be 0 100 without condensation The installation location shall always be accessible Mount the batte...

Страница 14: ...ections may only be made by qualified personnel Mounting the EI Battery Tools needed Electric drill 8mm bit hammer mallet level pencil socket wrench Accessory parts needed Sleeve anchors C Warning Bef...

Страница 15: ...plate 11 and 6 screws 3 from each side securing the front cover 9 Unlatch the two front cover locks from the bottom as shown 2 Tilt cover up and CAREFULLY swing the front cover to the left using cauti...

Страница 16: ...to make the required connections WARNING Danger to life from electric shock due to high voltages High voltages are present in the DC cables and during the operation of the system Do not install and op...

Страница 17: ...are located inside the EI Battery enclosure The PCS communication cable is used to connect the batteries to the Battery Management System BMS inside the EI Battery enclosure Only one battery module 1...

Страница 18: ...a terminating cap is required in the CAN COM port in the right side battery expansion wire box 12 Do not remove this cap Inner battery 1 Locate the cables labeled for the lower battery modules and cu...

Страница 19: ...outer battery black terminal labeled 9 Connect the lower outer BAT link out cable to the link out terminal on the lower outer battery Figure 21 Lower battery connections 10 After all three batteries h...

Страница 20: ...ery expansion wire box 12 Do not remove this cap In the next section Wiring the EI Battery Battery expansion a communication cable is routed between the two enclosures At the second enclosure this cab...

Страница 21: ...d 2 Philips screwdriver wire cutter crimping tools O type terminal and RJ 45 Accessories parts needed Wire ferrules D RJ 45 connector CAT5 6 8 6AWG conductors Note This section applies to systems with...

Страница 22: ...B and T 568A as shown below Either standard may be used as long as both ends of the cable use the same wiring standard Figure 27 Data cable wiring standards Table 4 T568A and T568B wiring standards RJ...

Страница 23: ...e EI Inverter Tools needed 2 Philips head screwdriver wire cutter crimping tools wire ferrule and RJ 45 Accessories parts needed Wire ferrules D 10 8AWG conductors RJ 45 connectors CAT5 6 cable Figure...

Страница 24: ...the terminals of BAT and BAT Communication cable 6 Route the CAT5 6 communication cable through the INV communications conduit 7 a Use an RJ 45 crimping tool to crimp an RJ 45 connector at each end o...

Страница 25: ...powering on the EI Residential Solution Table 5 Pre power checklist Item Acceptance Communications Cable The communications cable is labeled and properly connected to both the inverter and battery com...

Страница 26: ...e the Inverter connection wire box 8 2 If multiple batteries installed turn on the BAT Expansion breaker in the Battery expansion wire box 12 Otherwise skip this step 3 Turn on the inverter and wait 1...

Страница 27: ...on LED B2 3 4 are off Power 50 LED B1 2 are on LED B3 4 are off Power 75 LED B1 2 3 are on LED B4 are off Power 75 LED B1 2 3 4 are on Charge state Leaf Steady green Ring Power 25 LED B1 flashes LED...

Страница 28: ...75 LED B1 2 3 4 are on Manual forced OFF Leaf Red light flashing 0 1 second on 0 1 second off Ring Power 25 LED B1 is on LED B2 3 4 are off Power 50 LED B1 2 are on LED B3 4 are off Power 75 LED B1 2...

Страница 29: ...til the Leaf quickly flashes The DC output voltage is now turned off To turn on the battery system when no PV is available 2 Turn ON the disconnect switch 4 above the Inverter connection wire box 8 3...

Страница 30: ...ng If an issue does arise many times it can be resolved by understanding and addressing the error code provided The first level of communication is the LEDs on the front cover Refer to Table 14 to dec...

Страница 31: ...information from the PV modules may be necessary If the inverter is not communicating or module level monitoring was not installed please provide the following Manufacturer and model of the PV modules...

Страница 32: ...cting the individual battery modules 5 Remove the battery modules 6 Unscrew the mounting bolts from the wall and slide out from the wall Packing the battery When possible pack the battery and battery...

Страница 33: ...y Inc www tigoenergy com support tigoenergy com Warranty The warranty of the EI Battery is 10 years or 6 000 cycles whichever occurs first The warranty document can be found at https www tigoenergy co...

Страница 34: ...34 P a g e Tigo Energy Inc www tigoenergy com support tigoenergy com Specifications...

Отзывы: