Dionex Reagent-Free Controller
86
Doc. 031880-04 1/12
5. Locate the EGC vent line tubing, label, tubing clips, and barbed luer
lock, supplied with the holder. Locate the luer adapter and cap,
supplied with the EGC. Slide the label onto one end of the tubing and
then push the barbed luer lock onto the tubing.
6. Remove the plug from the vent opening and wipe off any liquid from
the EGC.
7. Screw the luer adapter onto the vent opening. Remove the cap on the
luer adapter by twisting.
Save the cap.
NOTE To prevent leaks from the EGC, always replace the
luer adapter cap before moving the EGC.
8. Twist the luer lock and EGC vent line into the luer adapter (see
Figure 99. EGC Vent Line Installed
Luer Lock
Luer Adapter
EGC
Vent
Line