5 • Service
Doc. 065289-03 10/12
111
6. Pull the valve straight out from the
component panel and begin pulling
the attached cable out of the opening
in the panel.
7. The cable is connected to a
matching cable inside the Dionex
ICS-1100. Continue pulling until the
connectors for the two cables are
outside the panel (see
Disconnect the cables.
Figure 5-19. Eluent Valve Cable
8. Remove the mounting plate on the
old valve by unscrewing and
removing the two screws. Save the
screws.
9. Thread the cable from the new
eluent valve through the mounting
plate.
10. Attach the mounting plate to the
new valve using the screws
removed in
.
Figure 5-20. Removing the Eluent Valve Mounting Plate
11. Connect the cable from the new valve (P/N 057945) to the Dionex ICS-1100
cable. Feed the cables back inside the Dionex ICS-1100.
Eluent Valve
Cable
Disconnect
cables
Eluent Valve
Remove
screws
Содержание Dionex ICS-1100
Страница 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Страница 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Страница 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Страница 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Страница 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Страница 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Страница 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Страница 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...