5 • Service
Doc. 065289-03 10/12
95
5.6
Cleaning and Replacing the Pump Check Valves
A dirty check valve causes erratic flow rates and pressures. In addition, it
may cause the pump to lose prime and/or be difficult to reprime. If possible,
replace dirty check valves. If new check valves are not available, follow the
instructions for cleaning.
Replacing Check Valves
1. Close the eluent valve from the Dionex ICS-1100 Control panel in
Chromeleon.
2. Turn off the main power switch, to ensure that you do not unintentionally start
the Dionex ICS-1100.
3. To prevent contamination of pump parts, put on a pair of rubber gloves before
disassembling the pump head.
4. Disconnect the tube fittings from the inlet and outlet check valve assemblies
on the primary pump head (see
5. Use a 1/2-inch wrench to loosen both check valve assemblies. Remove the
check valve assemblies from the pump head.
NOTE The inlet check valve assembly housing has a 1/4-28 port.
The outlet check valve assembly housing has a 10-32 port.
Figure 5-7. Pump Heads
Secondary
Pump Head
Primary
Pump Head
Outlet Check
Valve
Inlet Check
Valve
Acorn Nuts
Содержание Dionex ICS-1100
Страница 10: ...Dionex ICS 1100 Ion Chromatography System viii Doc 065289 03 10 12 ...
Страница 20: ...Dionex ICS 1100 Ion Chromatography System 10 Doc 065289 03 10 12 ...
Страница 46: ...Dionex ICS 1100 Ion Chromatography System 36 Doc 065289 03 10 12 ...
Страница 68: ...Dionex ICS 1100 Ion Chromatography System 58 Doc 065289 03 10 12 ...
Страница 148: ...Dionex ICS 1100 Ion Chromatography System 138 Doc 065289 03 10 12 ...
Страница 152: ...Dionex ICS 1100 Ion Chromatography System 142 Doc 065289 03 10 12 ...
Страница 158: ...Dionex ICS 1100 Ion Chromatography System 148 Doc 065289 03 10 12 ...
Страница 168: ...Dionex ICS 1100 Ion Chromatography System Index 10 Doc 065289 03 10 12 ...