3
Installation
Installation of the AI 3000/AS 3000 II on the GC
52
AI 3000/AS 3000 Sampling System - Operating Manual
Thermo Scientific
Figure 47.
Syringe Installation (2)
Electrical Connections
The instrument must be powered as indicated in
.
Before performing electrical connections, ensure that the requirements reported in paragraph
have been fulfilled.
This section provides the instruction to connect the AI 3000/AS 3000 II, in standard o
Gemini configuration, to a TRACE 1300/TRACE 1310, TRACE GC Ultra, or FOCUS GC.
Refer to:
•
•
Standard Configuration
Proceed as follows:
1. By using the cable provided, connect the 6-pin female connector marked
GC
located on
the sampling unit back side and the connector, located on the rear panel of the GC,
marked:
•
AUTOSAMPLER HANDSHAKE
in the case of TRACE 1300/TRACE 1310.
•
SAMPLER SIGNAL
in case of TRACE GC Ultra and FOCUS GC.
1
Содержание AI 3000
Страница 4: ......
Страница 12: ...Contents xii AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific ...
Страница 104: ...A 86 AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific ...
Страница 108: ...90 AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific Index W ...