3
Installation
Who Performs the Installation
22
AI 3000/AS 3000 Sampling System - Operating Manual
Thermo Scientific
Who Performs the Installation
The AI 3000/AS 3000 II is installed by authorized Thermo Fisher Scientific field service
engineers (FSE), who will check its correct operation. For more details, please contact
Thermo Fisher Scientific local representatives. Should the instrument not be installed by
Thermo Fisher Scientific personnel, please strictly adhere to the following instructions.
Electrical Requirements
The instrument must be electrically supplied as indicated in the
.
How to Lift and Carry the Sampling Unit
The AI 3000/AS 3000 II must be lifted and carried by hand. See
.
Figure 20.
How to lift and carry the Sampling Unit
CAUTION
The power line and the connections between the instruments must maintain
good electrical grounding. Poor grounding represents a danger for the operator and may
seriously affect the instrument performance.
Do not connect the AI 3000/AS 3000 II to lines feeding devices of a heavy duty nature,
such as motors, UV lamps, refrigerators and other devices that can generate disturbances.
Pay attention not to leave any cable connecting the sampling unit and the
chromatographic system or the power cord close to the GC hot air vents.
Содержание AI 3000
Страница 4: ......
Страница 12: ...Contents xii AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific ...
Страница 104: ...A 86 AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific ...
Страница 108: ...90 AI 3000 AS 3000 Sampling System Operating Manual Thermo Scientific Index W ...