Operating Instructions
56
PTI
Turn the
U
NIT
O
N
. Allow Unit to start and stabilize.
Complete the following steps:
1.Press the
PTI
Special Function key.
2. Press the F2/F3 keys to scroll down to select from the different PTI test.
3. Press the F4 key to ACCEPT and start the PTI or test.
During testing the screen is divided into 3 sections.
Section 1:
Showing the list of test to be performed and there state.
List of possible states:
Awaiting: the test has not yet been performed.
Testing: the test is ongoing.
Pass: the test has been tested, with the result Pass.
Fail: the test has been tested, with the result Fail.
Skipped: the test is skipped, based on conditions.
Section 2:
Additional information, to explain the test, is shown together with a indication of the time frame.
Section 3:
This section displays actual readings and the expected power consumption.
4. Press the
F2/F3
keys to scroll between each of the tests.
5. PTI test ends automatically. Pressing
F1
(Exit) will not stop the PTI, but will allow the user to view
and scroll through other menu's.Once the PTI is finished you will need to exit the PTI menu for the
unit to go back to normal operation.
Содержание 098203
Страница 2: ......
Страница 3: ...MAGNUM TK 60275 4 MM Rev 3 08 15 Copyright 2012 Ingersoll Rand EMEIA Printed in Ireland...
Страница 193: ...Refrigeration Maintenance 191 Figure 163 Filter Drier...
Страница 200: ...Refrigeration Maintenance 198 Figure 169 Receiver Tank Figure 170 Water Cooled Condenser Tank...
Страница 257: ...255 Schematic Diagram RELEASED 19 Sep 2013...
Страница 258: ...256 Wiring Diagram Page 1 of 2 RELEASED 19 Sep 2013...
Страница 259: ...257 Wiring Diagram Page 2 of 2 RELEASED 19 Sep 2013...
Страница 263: ......