Electrical Maintenance
156
High Pressure Cutout Switch Installation
Install the high pressure cutout switch by performing the following steps:
1. Apply Locktite sealant to the threads of the switch.
2. Install switch in compressor flange.
3. Pressurize the compressor with refrigerant and check for leaks.
4. Evacuate the compressor (see “Evacuation and Cleanup of the Refrigeration System”).
5. Route wires into the control box and connect to proper terminals.
6. Back seat the discharge service valve by turning the valve fully counter-clockwise.
7. Back seat the suction service valve by turning the valve fully counter-clockwise.
8. Turn the digital service valve one quarter turn to the left.
9. Perform a controller pretrip test to verify system operation.
1.
Low Pressure Cutout Switch
2.
High Pressure Cutout Switch
3.
Discharge Service Valve
4.
Suction Service Valve
Figure 130: Low and High Pressure Cutout Switches
1
2
3
4
Содержание 098203
Страница 2: ......
Страница 3: ...MAGNUM TK 60275 4 MM Rev 3 08 15 Copyright 2012 Ingersoll Rand EMEIA Printed in Ireland...
Страница 193: ...Refrigeration Maintenance 191 Figure 163 Filter Drier...
Страница 200: ...Refrigeration Maintenance 198 Figure 169 Receiver Tank Figure 170 Water Cooled Condenser Tank...
Страница 257: ...255 Schematic Diagram RELEASED 19 Sep 2013...
Страница 258: ...256 Wiring Diagram Page 1 of 2 RELEASED 19 Sep 2013...
Страница 259: ...257 Wiring Diagram Page 2 of 2 RELEASED 19 Sep 2013...
Страница 263: ......