26
INsTAllATION
© TESVOLT We reserve the right to make technical changes. Version RD.TI.015.E.ENG_Installation_Manual_TS48V_v.C.01 Last revised 06/2020
8
TS cabinet only:
Now fit the cage nuts
E
for fastening the bat-
tery modules
2
using the auxiliary tool
E.1
. Distribute the
cage nuts from bottom to top. Start at the bottom edge of the
slide rail for the relevant battery module. Fit the first two cage
nuts in the opening directly above on both sides, leave the next
seven openings empty and fit another pair of cage nuts in the
next opening in both rack rails.
9
TS cabinet only:
Fit the cage nuts
E
for fastening the APU
1
in the rack rails using the auxiliary tool
E.1
. The APU occupies
the topmost slide rail in the cabinet. Distribute the cage nuts from
bottom to top. Start at the bottom edge of the slide rail. Leave the
first opening empty, fit the first two cage nuts in the next opening
on both sides, leave the next four openings empty and fit another
pair of cage nuts in the next opening in both rack rails.
10
VX cabinet only:
You can now fit the cage nuts
E
for fastening
the battery modules
2
using the auxiliary tool
E.1
. Distribute
the cage nuts from bottom to top. Fit the first two cage nuts in
the second opening on both sides. Fit two more cage nuts in the
topmost opening on both sides.
11
VX cabinet only:
Fit the cage nuts
E
for fastening the APU
1
into the slide rails (the APU occupies the topmost slide rails).
Start at the bottom edge of the slide rails. Fit the first two cage
nuts
E
in the lowest opening on both sides. The remaining two
cage nuts are fitted in the second hole from the top.
12
TS cabinet only:
Fit the grounding point to an appropriate loca-
tion on the cabinet’s frame profile (e.g. at the front, on the lower
left cabinet frame profile). The grounding point
I
is fastened
with two ST5.5 x 12 (TX 30) self-tapping screws
L1
.