background image

1

This guide provides an overview of the hardware installation process for Oracle’s Sun Storage 6180 array. For
detailed information, have the

Sun Storage 6180 Array Hardware Installation Guide

available as you go through the

steps in this document.

Additional documentation is listed in the section

“Documentation for This Product”

and available at the Oracle

documentation web site:

http://www.oracle.com/technetwork/indexes/documentation/index.html

Review Ship Kit Contents

FIGURE 1

Ship Kit Items

Controller Tray Ship Kit

1.

Documentation

5.

Two Fibre Channel (FC) cables

2.

Four or Eight Small Form-factor Pluggables (SFPs)

6.

Two PS2 6-pin DIN to RJ45 serial cables (for service access)

3.

Power cables

*

* AC power cables are shipped in a carton separate from the array unit. Although not pictured, DC power cables are included for DC units.

7.

Two RJ45-DB9 serial adapters (one straight through and one
null modem)

4.

Two RJ45-RJ45 Ethernet cables

Sun Storage 6180 Array

Getting Started Guide

Отзывы: