12
PRePARATION
© TESVOLT We reserve the right to make technical changes. Version RD.TI.015.E.ENG_Installation_Manual_TS48V_v.C.01 Last revised 06/2020
3.4 INSTALLATION SITE
Necessary prerequisites
Section “1.5 Appropriate use” on page 7 lists all the necessary prerequisites and conditions for
installing a TS 48 V.
When selecting the installation site, bear in mind transport routes and the necessary site clearance.
WARNING! Possible damage to the building due to excessive static loads.
Once installed, the battery storage system usually weighs from several hundred kilograms to signifi-
cantly more than 1,000 kilograms. Ensure that the installation site has sufficient load-bearing capacity. If
in doubt, consult a structural engineer.
Dimensions
≥190
≥65
≥65
60
60
≥70
≥1
5
B
A
TS 25
≥
145 130
TS 40
≥205
190
TS 50
≥245
230
A
Tilt height = A
Cabinet height = B
Type
B
All dimensions in cm.
Space required
(incl. installation)
Additional space required
for servicing, etc.
STOP
STOP