![TESTO 0572 0158 Скачать руководство пользователя страница 77](http://html1.mh-extra.com/html/testo/0572-0158/0572-0158_instruction-manual_1092200077.webp)
5 First steps
77
23. Postpone the start of measurement if necessary.
24. Click on
[Finish]
to end the hardware startup.
- A message about the successful configuration of the hardware
is displayed.
25. Confirm the message by clicking
[OK]
.
- The new hardware is now ready to be used.
Pos: 79 /TD/Erste Schritte/testo Saveris/06 ****Probelauf/00 Probelauf und Abnahme durchführen @ 0\mod_1189157354187_79.docx @ 4054 @ 3 @ 1
5.12.
Performing the test run
The test run must be performed to ensure proper
operation of the measuring system.
Pos: 80 /TD/Erste Schritte/testo Saveris/06 ****Probelauf/01 Systemverfügbarkeit prüfen @ 0\mod_1189157395875_79.docx @ 4094 @ 3 @ 1
5.12.1.
Checking system availability
Wait for the first connection between the Saveris base
and the probes to check the system availability.
>
Click on
System
in the navigation area.
- The following entries are shown in the tree structure in the data
window:
•
Base
Содержание 0572 0158
Страница 1: ...Measurement data monitoring with testo Saveris Small Business Edition Instruction manual...
Страница 2: ...2...
Страница 54: ...5 First steps 54 2 Click on Next The System status dialogue box is displayed with the tab General...
Страница 132: ...7 Maintaining the product 132 2 Click on Continue The System status dialogue with the General tab is shown...
Страница 177: ...8 Tips and assistance 177 Ende der Liste f r Textmarke Inhalt...
Страница 178: ...0970 4020 en 13 V04 5 SP4 en GB...