Terry Melody 1 - Installation Instructions - ED01050g
54
XB00198 B Page 2 of 5
AUTHOR: MK 13/05/2010
Terry Group Intranet > Production > Bulletins
Installation Instructions
1.
When the lift is positioned, place the template* in position on the left or right of the scissor
frame. Please follow the instructions on the template are and drill four location holes (drill for
fixing kit CF210 provided) for the control post.
*Paper template provided with instructions.
2.
Feed the cable from the scissors through the cable guards on the ramp mounting and into
the call post, checking the required length and position before proceeding.
Fix the ramp to the base frame as shown with the M6 x 16 CSK screws and fasteners
provided with the Ramp Fixing Kit (LS38778).
Fix the call post in the required position with the coach crews and Rawl plugs provided
(CF210) in the Call Post Fixing Kit (LS38770).
Drilling Locations
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...