Terry Melody 1 - Installation Instructions - ED01050g
58
XB00218 Page 1 of 1
AUTHOR: MK 29/06/2010
Terry Group Intranet > Production > Bulletins
1. Measure the height of the bridging step from the top of the upper step to the lift
platform and divide the figure by 3 to get the step height increments.
2. Adjust the bottom step to this figure using the collar situated on the step upright.
3. Once the lower step is adjusted, use the adjustment collar for the second and third
steps to achieve equal heights for all 3 steps.
2
Measure the height of
the Bridging Step from
the upper level to the
Platform.
LIFT PLATFORM
Use the adjustment
collars to adjust the
heights of the step
and achieve equal
heights between each
step.
3
TRIPLE BRIDGING STEP HEIGHT ADJUSTMENT (XB00218)
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...