Terry Melody 1 - Installation Instructions - ED01050g
55
XB00198 B Page 3 of 5
AUTHOR: MK 13/05/2010
Terry Group Intranet > Production > Bulletins
3.
Once the lower post is fixed into position, connect the cable from lift using the connector
blocks to the cable from the articulated head. Insert the articulated head into the top of the
post in the required orientation. When satisfied with a tight and square fit, drill a 3.5mm hole
through the fastening tab using the existing hole in the post as a guide. When the hole is
drilled secure the post using the M4 x 10 ST. CSK Tap-Tite Screw (CZ149) provided in the
Call Post Kit (LS38825 - Painted or LS38823 - Stainless).
Drill 3.5mm
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...