Terry Melody 1 - Installation Instructions - ED01050g
52
XB00223
Page 14 of 14
AUTHOR: MK
29/04/2010
Terry Group Internet > Production > Bulletins
Step-lift Upper Level Gate Pit Installation Instruction
1
. Place the gate support section in the prepared pit, inline with the location of the upper level
gate base. Using the M8 x 150 Coach Screws and M8 washers provided with the Gate
Support Kit (LS38820) fasten the base plate of the upper level gate onto the section and into
the floor of the pit
Assemble upper level gate as normal.
Pack section to level
as required.
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...