Terry Melody 1 - Installation Instructions - ED01050g
47
XB00223
Page 9 of 14
AUTHOR: MK
29/04/2010
Terry Group Internet > Production > Bulletins
10.
Finally fit the gate post side blanking plates found in the fixing kit (LS38966) using the
plate/gland kit (LS38941) for the wire outlet side.
The gland provided is a 25mm gland and therefore requires 25mm conduit rather than the
standard 20mm
A second blanking plate is provided in the event that conduit as been pre fitted between the
gate posts.
When the gate and lift are completely assembled, finaly lay the (LT03041) anti slip tape
provided over the middle set of plinth fixings, ideally achieving an equal spacing between the
pre fitted strip and the rear edge of the plinth.
LT03041 – Anti Slip Tape
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...