Terry Melody 1 - Installation Instructions - ED01050g
46
XB00223
Page 8 of 14
AUTHOR: MK
29/04/2010
Terry Group Internet > Production > Bulletins
8.
Cut the back board to height and place within the gate posts plinth and floor resting on the
back board angle. Drill and tap M6 through the board into the angle for (CZ106) M6x16
Stainless CSK screws from the common fixing kit (LS38561).
Notch if
required
9.
Attach the call station plate assembly (if not
fitted already) (LT04770 for Melody LS38013 for
TSL) using the M4 security screw provided.
Cap the gate posts with the plastic blanking plugs
(CP147).
IMPORTANT:
If running cabling from lift to gate,
directly through aluminium back board, the
backboard must be notched neatly at the bottom
centre to allow the black flexible conduit to run
through it from the centre rear of the lift.
Содержание Melody 1
Страница 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Страница 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Страница 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Страница 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Страница 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Страница 27: ...Terry Melody 1 Installation Instructions ED01050g 27 ref ED01063e dated 10 01 2012 MELODY 1 WIRING DIAGRAM...
Страница 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Страница 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Страница 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Страница 37: ...Terry Melody 1 Installation Instructions ED01050g 37 ref ED01076a dated 10 01 2012 BULLETINS NOTES...
Страница 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Страница 66: ...Terry Melody 1 Installation Instructions ED01050g 66...