4 - 26
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 4 • Repair Procedures
5-2
Secondary Boom Lift Cylinders
There are two secondary boom lift cylinders
incorporated in the structure of the secondary
boom assembly. These cylinders operate in
parallel and require hydraulic pressure to extend
and retract. Each secondary boom lift cylinder is
equipped with a counterbalance valve to prevent
movement in the event of a hydraulic line failure.
How to Remove a Secondary
Boom Lift Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting this
procedure without these skills and
tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: When removing a hose assembly or fitting,
the O-ring on the fitting and/or hose end must be
replaced and then torqued to specification during
installation.
Refer to Section 2,
Hydraulic Hose and Fitting
Torque Specifications.
1 Lower the secondary boom to the stowed
position.
2 Raise the primary boom so that it is above the
secondary boom lift cylinder rod-end pivot pin.
SECONDARY BOOM COMPONENTS
3 Tag, disconnect and plug the hydraulic hoses
on the secondary boom lift cylinder.
Bodily injury hazard. Spraying
hydraulic oil can penetrate and
burn skin. Loosen hydraulic
connections very slowly to allow
the oil pressure to dissipate
gradually. Do not allow oil to squirt
or spray.
4 Remove the pin retaining fasteners from the
secondary boom lift cylinder rod-end pivot pin
and barrel-end pivot pin. Do not remove the
pins.
5 Attach a strap from an overhead crane to the
lug on the rod end of the secondary boom lift
cylinder for support. Do not apply any lifting
pressure.
6 Use a soft metal drift to drive the barrel-end
pivot pin half way out. Lower the barrel end of
the secondary boom lift cylinder and let it hang
down.
7 Use a soft metal drift to drive the rod-end pivot
pin half way out.
8 Remove the secondary boom lift cylinder from
the machine.
Crushing hazard. The secondary
boom lift cylinder could become
unbalanced and fall when
removed from the machine if not
properly attached to the overhead
crane.
Component damage hazard. When
removing a secondary boom lift
cylinder from the machine, be
careful not to damage the
counterbalance valve at the barrel
end of the cylinder.
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......