Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 15
September 2015
Section 3 • Scheduled Maintenance Procedures
CHECKLIST
B
PROCEDURES
B-3
Check the Batteries
Genie requires that this procedure be performed
every 250 hours or quarterly, whichever comes
first.
Proper battery condition is essential to good
machine performance and operational safety.
Improper fluid levels or damaged cables and
connections can result in component damage and
hazardous conditions.
Electrocution/burn hazard. Contact
with electrically charged circuits
could result in death or serious
injury. Remove all rings, watches
and other jewelry.
Bodily injury hazard. Batteries
contain acid. Avoid spilling or
contacting battery acid. Neutralize
battery acid spills with baking soda
and water.
1 Put on protective clothing and eye wear.
2 Be sure that the battery cable connections are
free of corrosion.
Note: Adding terminal protectors and a corrosion
preventative sealant will help eliminate corrosion on
the battery terminals and cables.
3 Be sure that the battery retainers and cable
connections are tight.
4 Fully charge the battery. Allow the battery to
rest 24 hours before performing this procedure
to allow the battery cells to equalize.
5 Remove the battery vent caps and check the
specific gravity of each battery cell with a
hydrometer. Note the results.
6 Check the ambient air temperature and adjust
the specific gravity reading for each cell as
follows:
•
Add 0.004 to the reading of each cell for
every 10° F / 5.5° C above 80° F / 26.7° C.
•
Subtract 0.004 from the reading of each cell for
every 10° F / 5.5° C below 80° F / 26.7° C.
Result: All battery cells display an adjusted
specific gravity of 1.277 +/- 0.007. The battery
is fully charged. Proceed to step 10.
Result: One or more battery cells display a
specific gravity of 1.269 or below. Proceed to
step 7.
7 Perform an equalizing charge OR fully charge
the batteries and allow the battery to rest at
least 6 hours.
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......