Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 17
September 2015
Section 3 • Scheduled Maintenance Procedures
CHECKLIST
B
PROCEDURES
B-5
Check the Tires, Wheels and
Lug Nut Torque
Maintaining the tires and wheels in good
condition, including proper wheel fastener torque,
is essential to safe operation and good
performance. Tire and/or wheel failure could result
in a machine tip-over. Component damage may
also result if problems are not discovered and
repaired in a timely fashion.
Tip over hazard. The tires on this
machine are foam-filled and are
essential to machine stability and
safe machine operation. Using an
air-filled tire on this machine can
compromise machine stability and
will cause the machine to tip over.
Note: The tires on this machine are foam-filled and
do not need air added to them.
1 Check the tire surface and sidewalls for cuts,
cracks, punctures and unusual wear.
2 Check each wheel for damage, bends and
cracked welds.
3 Check each lug nut for proper torque. Refer to
Section 2,
Specifications.
5 Open the ground controls side turntable cover.
6 Inspect the following areas for burnt, chafed,
corroded and loose wires:
• Inside of the ground control box
• Hydraulic manifold wiring
7 Inspect for a liberal coating of dielectric grease
at the following location:
• All wire harness connectors to the ground
control box
8 Raise the secondary boom until the mid-pivot is
approximately 10 feet / 3 m off the ground.
9 Remove the center turntable cover.
10 Inspect the turntable center area for burnt,
chafed and pinched cables.
11 Install the center turntable cover.
12 Lower the boom to the stowed position and turn
the machine off.
13 Inspect the following areas for burnt, chafed,
corroded, pinched and loose wires:
• Cable track on the primary, jib and
secondary booms
• Jib boom to platform cable harness
• Inside of the platform control box
14 Inspect for a liberal coating of dielectric grease
at the following location:
• All wire harness connectors to the platform
control box
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......