3 - 8
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 3 • Scheduled Maintenance Procedures
A-3
Perform Function Tests
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the appropriate operator's manual. Refer
to the Operator's Manual on your machine.
A-2
Perform Pre-operation
Inspection
Completing a pre-operation inspection is essential
to safe machine operation. The pre-operation
inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently wrong
with a machine before the operator performs the
function tests. The pre-operation inspection also
serves to determine if routine maintenance
procedures are required.
Complete information to perform this procedure is
available in the appropriate operator's manual. Refer
to the Operator's Manual on your machine.
CHECKLIST A PROCEDURES
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......