Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 5
September 2015
Section 3 • Scheduled Maintenance Procedures
Checklist A
Y N R
A-1 Manuals and Decals
A-2 Pre-operation
inspection
A-3 Function tests
A-4 Generator belts and
pulleys
Perform after 50 hours:
A-5 30 Day Service
A-6 Perform engine
maintenance
Perform every 75 hours:
A-7 Perform engine
maintenance
Perform every 100 hours:
A-8 Grease rotation
bearing
A-9 Perform engine
maintenance
Perform every 150 hours:
A-10 Perform engine
maintenance
Perform every 200 hours:
A-11 Perform engine
maintenance
Checklist B
Y N R
B-1 Radiator
B-2 Exhaust system
B-3
Batteries
B-4
Electrical wiring
B-5
Lug nut torque
B-6
Brake configuration
B-7
Drive hub oil level
B-8
Engine RPM
B-9
Ground control
override
B-10 Platform leveling
B-11 Engine idle select
B-12 Drive brakes
B-13 Drive speed - stowed
B-14 Drive speed - raised
B-15 Alarm package
(if equipped)
B-16 Electrical contactors
B-17 Hydraulic oil analysis
B-18 Emergency power
Perform every 400 hours:
B-19 Perform engine
maintenance
Checklist C
Y N R
C-1 Perform engine
maintenance
C-2 Grease platform
overload (if equipped)
C-3 Test platform
overload (if equipped)
Perform every 800 hours:
C-4 Perform engine
maintenance
Instructions
• Make copies of this page to use for
each inspection.
• Select the appropriate checklist(s) for
the type of inspection to be
performed.
Daily or 8 hour
Inspection:
A
Quarterly or 250 hour
Inspection:
A+B
Six Month or 500 hour
Inspection:
A+B+C
Annual or 1000 hours
Inspection:
A+B+C+D
2 Year or 2000 hour
Inspection:
A+B+C+D+E
• Place a check in the appropriate box
after each inspection procedure is
completed.
• If any inspection receives an "N", tag
and remove the machine from
service, repair and reinspect it. After
repair, place a check in the "R" box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Comments
Maintenance Inspection Report
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......