4 - 24
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 4 • Repair Procedures
SECONDARY BOOM COMPONENTS
39 Use a soft metal drift to remove the upper
compression link pivot pin from the number 2
arm. Remove the compression link from the
machine.
Crushing hazard. The number 2
arm could fall when the
compression link is disconnected
from the number 2 arm if not
properly supported by the
overhead crane.
Crushing hazard. The
compression link may fall if not
properly supported when removed
from the secondary boom
assembly.
40 Remove the number 2 arm from the machine.
Crushing hazard. The number 2
arm could become unbalanced
and fall when removed from the
secondary boom assembly if not
properly supported by the
overhead crane.
41 Remove the upper and lower hose and cable
covers from the number 3 arm.
42 Pull all of the cables and hoses from the
number 3 arm and lay them over the turntable
counterweight.
Component damage hazard.
Cables and hoses can be
damaged if they are kinked or
pinched.
43 Open the ground controls side turntable cover.
44 Remove the fuel tank filler cap.
45 Using an approved hand-operated pump, drain
the fuel tank into a container of suitable
capacity. Refer to Section 2,
Specifications
.
Explosion and fire hazard. Engine
fuels are combustible. Perform this
procedure in an open, well-
ventilated area away from heaters,
sparks, flames and lighted
tobacco. Always have an
approved fire extinguisher within
easy reach.
Explosion and fire hazard. When
transferring fuel, connect a
grounding wire between the
machine and pump or container.
Note: Be sure to only use a hand-operated pump
suitable for use with gasoline and diesel fuel.
46 Tag, disconnect and plug the fuel hoses from
the fuel tank. Clean up any fuel that may have
spilled.
47 Remove the fuel tank mounting fasteners.
Carefully remove the fuel tank from the
machine.
Component damage hazard. The
fuel tank is plastic and may
become damaged if allowed to fall.
Note: Clean the fuel tank and inspect for cracks
and other damage before installing it onto the
machine.
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......