
Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 43
September 2015
Section 3 • Scheduled Maintenance Procedures
8 Remove the hydraulic tank from the machine.
Component damage hazard. The
hydraulic tank is plastic and may
become damaged if allowed to fall.
9 Remove the suction strainer from the tank and
clean it using a mild solvent.
10 Rinse out the inside of the tank using a mild
solvent.
11 Install the suction strainer and drain plug using
a thread sealer on the threads.
12 Place the hydraulic tank onto the machine.
13 Install the hydraulic hoses.
14 Install the hydraulic tank retaining strap.
Component damage hazard. The
hydraulic tank may become
damaged if the tank strap
fasteners are over tightened.
15 Fill the tank with hydraulic oil until the fluid is
within the
FULL
and
ADD
marks on the hydraulic
tank. Do not overfill.
16 Clean up any oil that may have spilled. Properly
discard of oil.
17 Operate all machine functions through a full
cycle and check for leaks.
E-2
Grease the Steer Axle
Wheel Bearings
Maintaining the steer axle wheel bearings is
essential for safe machine operation and service
life. Operating the machine with loose or worn
wheel bearings may cause an unsafe operating
condition and continued use may result in
component damage. Extremely wet or dirty
conditions or regular steam cleaning and pressure
washing of the machine may require that this
procedure be performed more often.
1 Loosen the wheel lug nuts. Do not remove
them.
2 Block the non-steer wheels, then center a lifting
jack under the steer axle.
3 Raise the machine 6 inches / 15 cm and place
blocks under the drive chassis for support.
4 Remove the lug nuts. Remove the tire and
wheel assembly.
5 Check for wheel bearing wear by attempting to
move the wheel hub side to side, then up and
down.
Result: There should be no side to side or up
and down movement.
Skip to step 10 if there is no movement.
CHECKLIST
E
PROCEDURES
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......