
3 - 44
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
Part No. 237062
September 2015
Section 3 • Scheduled Maintenance Procedures
CHECKLIST
E
PROCEDURES
6 Remove the dust cap from the hub. Remove the
cotter pin from the castle nut.
7 Tighten the castle nut to 150 ft-lbs / 203 Nm to
seat the bearings.
8 Loosen the castle nut and retighten to
35 ft-lbs / 47 Nm.
9 Check for wheel bearing wear by attempting to
move the wheel hub side to side, then up and
down.
Result: If there is no side to side or up and
down movement, continue with step 10 and
grease the wheel bearings.
Result: If there is side to side or up and down
movement, continue to step 10 and replace the
wheel bearings with new ones.
Note: When replacing a wheel bearing, both the
inner and outer bearings, including the pressed-in
races, must be replaced.
10 Remove the castle nut.
11 Pull the hub off of the spindle. The washer and
outer bearing should fall loose from the hub.
12 Place the hub on a flat surface and gently pry
the bearing seal out of the hub. Remove the
rear bearing.
13 Pack both bearings with clean, fresh grease.
14 Place the large inner bearing into the rear of the
hub.
15 Install a new bearing grease seal into the hub by
pressing it evenly into the hub until it is flush.
Note: Always replace the bearing grease seal when
removing the hub.
16 Slide the hub onto the yoke spindle.
Component damage hazard. Do
not apply excessive force or
damage to the lip of the seal may
occur.
17 Place the outer bearing into the hub.
18 Install the washer and castle nut.
19 Tighten the castle nut to 150 ft-lbs / 203 Nm to
seat the bearings.
20 Loosen the castle nut and retighten to
35 ft-lbs / 47 Nm.
21 Install a new cotter pin. Bend the cotter pin
to lock it in.
Note: Always use a new cotter pin when installing a
castle nut.
22 Install the dust cap, then the tire and wheel
assembly. Torque the wheel lug nuts to
specification. Refer to Section 2,
Specifications.
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......