
Part No. 237062
Z-45/25 Bi-Energy • Z-45/25J Bi-Energy
3 - 23
September 2015
Section 3 • Scheduled Maintenance Procedures
B-12
Test the Drive Brakes
Proper brake action is essential to safe machine
operation. The machine uses drive motor
regenerative braking to stop the machine.
Hydraulically-released individual wheel brakes hold
the machine once it has stopped. The drive motor
regenerative braking should operate smoothly, free
of hesitation and jerking. Hydraulically-released
individual wheel brakes can appear to operate
normally when not fully operational.
Collision hazard. Be sure that the
machine is not in free-wheel or
partial free-wheel configuration.
Refer to B-6,
Confirm the Proper
Brake Configuration
.
Note: Select a test area that is firm, level and free
of obstructions.
1 Mark a test line on the ground for reference.
2 Lower the boom into the stowed position.
3 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the test line.
4 Bring the machine to maximum drive speed
before reaching the test line. Release the drive
joystick when your reference point on the
machine crosses the test line.
5 Measure the distance between the test line and
your machine reference point. Refer to
Section 2,
Specifications
.
Note: The brakes must be able to hold the machine
on any slope it is able to climb.
B-13
Test the Drive Speed -
Stowed Position
Proper drive function movement is essential to safe
machine operation. The drive function should
respond quickly and smoothly to operator control.
Drive performance should also be free of
hesitation, jerking and unusual noise over the
entire proportionally controlled speed range.
Note: Select a test area that is firm, level and free
of obstructions.
1 Create start and finish lines by marking two lines
on the ground 40 feet / 12.2 m apart.
2 Lower the boom into the stowed position.
3 Choose a point on the machine; i.e., contact
patch of a tire, as a visual reference for use
when crossing the start and finish lines.
4 Bring the machine to maximum drive speed
before reaching the start line. Begin timing
when your reference point on the machine
crosses the start line.
5 Continue at full speed and note the time when
the machine reference point passes over the
finish line. Refer to Section 2,
Specifications
.
CHECKLIST
B
PROCEDURES
Содержание Genie Z-45/25 Bi-Energy
Страница 1: ......
Страница 16: ...Z 45 25 Bi Energy Z 45 25J Bi Energy PartNo 237062 September2015 xvi This page intentionally left blank ...
Страница 139: ...6 15 Section 6 Schematics September2015 6 16 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 142: ...6 18 September2015 Section 6 Schematics 6 17 Electrical Schematic ANSI CSA from serial number Z452513A 45735 ...
Страница 159: ...6 35 Section 6 Schematics September2015 6 36 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 162: ...6 38 September2015 Section 6 Schematics 6 37 Electrical Schematic CE from serial number Z452513A 45735 ...
Страница 168: ...6 44 September2015 Section 6 Schematics 6 43 Platform Control Box Wiring Diagram CE from serial number Z452513A 45735 ...
Страница 189: ...6 65 Section 6 Schematics September2015 Electrical Schematic AS from serial number Z452513A 45735 6 66 ...
Страница 192: ...6 68 September2015 Section 6 Schematics Electrical Schematic AS from serial number Z452513A 45735 6 67 ...
Страница 198: ...6 74 September2015 Section 6 Schematics Platform Control Box Wiring Diagram AS from serial number Z452513A 45735 6 73 ...
Страница 202: ...6 78 September2015 Section 6 Schematics 6 77 Platform Options Wiring Diagram from serial number Z452513A 45735 ...
Страница 203: ...6 79 Section 6 Schematics September2015 Engine Panel Wiring Diagram 6 80 ...
Страница 206: ...6 82 September2015 Section 6 Schematics Power Panel Wiring Diagram 6 81 ...
Страница 207: ...6 83 Section 6 Schematics September2015 6 84 CTE Option Wiring Diagram CE ...
Страница 210: ...6 86 September2015 Section 6 Schematics 6 85 Charger Interlock Option ...
Страница 212: ...6 88 September2015 Section 6 Schematics Hydraulic Schematic 6 87 ...
Страница 213: ......