38
EN
E
N
4
.
M
ai
n
te
n
an
ce
a
n
d
c
le
an
in
g
37878
05-2017
4.5
Maintenance
(schedule), continued
ã
Terberg Machines B.V., IJsselstein, The Netherlands
All rights reserved. No part of this book may be reproduced, stored in database or retrieval system, or published, in any form or in any way,
electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from the publisher.
Maintenance schedule
(continued)
Machine type: OmniDEKA
Date:
Page 2 of 2
Machine number:
D
ai
ly
W
e
e
k
ly
6
-w
e
e
k
ly
A
n
n
u
al
Description
Additional
information:
see
paragraph
C
ar
ri
e
d
o
u
t
Pick-up teeth
-
-
- X
Check the pick-up teeth for wear.
--
Play in bearings
-
-
- X
Check the bin lift for excessive wear in the bearings.
4.4
Tipping angle
pick-up comb
-
-
- X
Readjust if necessary.
4.4
Lifting speed
-
-
- X
Check the cycle time of the bin lift.
4.4
Pressure in
hydraulic system
-
-
- X
Check the working pressure of the hydraulic system.
4.4
Hydraulic hoses
-
-
- X
Check the production date of the hydraulic hoses and
replace if necessary
4.4
Electrical
-
-
- X
Check that no moisture has penetrated the electrical wiring,
electrical connections and control stations.
--
Springs
-
-
- X
Check the springs of the lifting chairs and catcherbar.
4.4
Faults identified must be rectified before the bin lift is put into service!