70
Subsequent Operation
Delete digital input manner: select a digital input manner that needs to be deleted, and click
Clear data
.
8.3.1.6 DRM mode
When using the digital signal at the DI port (DI1 ~ DI4) of the Logger1000 as the dispatching
input, set the active control mode to
DRM mode
.
step 1 Click
Power control→Active power
to enter the active power interface.
step 2 Set the active control mode to
DRM mode
and click
Save
.
- - End
8.3.1.7 Country mode
If the dispatching input must be the national power dispatching instruction, the
Rctive
Control Mode
is set to
Country mode
.
step 1 Click
Power control→Active power
to enter the active power interface.
step 2 Set the active control mode to
Country mode
.
step 3 Select a country and PPC type, and click
Save
.
- - End
8.3.1.8 Scheduling Prohibited
Set the active control mode to
Scheduling prohibited
if the Logger1000 is prohibited to
perform active dispatching on the inverter.
step 1 Click
Power control→Active power
to enter the active power interface.
step 2 Set the active control mode to
Scheduling prohibited
and click
Save
.
- - End
8.3.2 Reactive Power
8.3.2.1 Disable
If the grid company does not need the power plant to adjust the voltage at the grid-
connection point, and the inverter does not need to cooperate with the grid for reactive
power compensation, the inverter keeps operating in the reactive-forbidden output state,
and the
Reactive Control Mode
is set to
Disable
.
step 1 Click
Power control→Reactive power
to enter the reactive power interface.
step 2 Set the
Reactive Control Mode
to
Disable
and click
Save
.
- - End
User Manual
Содержание Logger1000
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 28: ...18 step 3 The installation of the power box and Logger1000 is completed End 4 Mechanical Mounting User Manual...
Страница 94: ...M H 001405 www sungrowpower com Sungrow Power Supply Co Ltd...