46
7.8.4 AFCI Activation
step 1 Click
Device→AFCI Activation
to enter the corresponding interface.
step 2 Check the devices that need to self-checking, click
Self-checking
and then
Confirm
on the
pop-up window.
The status of the self-checking device must be
Enable
. If the self-checking status
is
Disabled
, you can click
to set the self-checking status to
Enable
.
step 3 The result column shows the self-checking status as
Self-testing
, and after 7 ~ 8 seconds,
the self-checking result will be displayed as
Self-checking Failure
or
Self-test pass
.
step 4 Click
Clear Fault
to bring up a dialog box showing the status of fault clearing.
- - End
7.9
History Data
Click
History data→Operation Log
to enter the corresponding interface.
On this interface, users can view history information.
7.10 System
7.10.1 Running Information
Click
System→Run Information
to enter the corresponding interface.
Information such as mobile network signal strength, WLAN, AI voltage, DI status can be
viewed.
7.10.2 System Maintenance
7.10.2.1 System upgrade
Users can upgrade Logger1000 on the Web interface.
step 1 Click
System→System Maintenance
to enter the corresponding interface.
step 2 Click
System Upgrade
, select the upgrade file, and export it to the system.
step 3 Click
Upgrade
on the pop-up version information window. The system enters upgrade state.
- - End
The upgrade file should be in the ".zip" format.
7.10.2.2 Log export
step 1 Click
System→System Maintenance
to enter the corresponding interface.
step 2 Click the button
Log Export
to enter the corresponding interface.
User Manual
Содержание Logger1000
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 28: ...18 step 3 The installation of the power box and Logger1000 is completed End 4 Mechanical Mounting User Manual...
Страница 94: ...M H 001405 www sungrowpower com Sungrow Power Supply Co Ltd...