42
7.8.1.6 Add the Third-party Meter (Custom)
step 1 Click
Device→Device List
to enter the corresponding interface.
step 2 Click
Add Device
, select
Meter
option in the
Device Type
.
step 3 Select the port (COM1/COM2/COM3/NET) that the meter is actually connected to in the
Port
.
step 4 Select
Others
option in the
Device Model
.
step 5 Select
Custom
option in the
Configuration Method
. Click
Next
to enter
Configure
Measuring Point
the interface.
table 7-1 Parameter description
Parameter
Description
Byte Order
Refer to the communication protocol of the meter, parse
the order of the read byte stream
PT Transformation Ratio
Refer to the communication protocol of the meter, voltage
transformation ratio
CT Transformation Ratio
Refer to the communication protocol of the meter, current
transformation ratio
Beginning Address
The beginning address of the device
Quantity of Device
The number of the meter
Debug Address
The device address to be read when click
Read-Back
, the
range is [(“Beginning Address”), (“Beginning Address” +
”Quantity of Device”-1)]
Modbus Address
Refer to the communication protocol of the meter, the
address of Modbus communication protocol, priority to
select the register address corresponding to the data type
of “Float”
Register Type
Refer to the communication protocol of the meter, the
register type of the corresponding measuring point
Data Type
Refer to the communication protocol of the meter, the data
type of the corresponding measuring point
Read Type
With or without framing when send messages at this point,
recommend to choose continuous type
Coefficient
Refer to the communication protocol of the meter, the
coefficient that multiplied the value of the data read
Read-back Value
The value of the selected measuring point read when
clicking
Read-back
The user can select up to 21 objects for setting. Their corresponding parameters
such as Modbus address please refer to the user manual of the connected meter.
User Manual
Содержание Logger1000
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 28: ...18 step 3 The installation of the power box and Logger1000 is completed End 4 Mechanical Mounting User Manual...
Страница 94: ...M H 001405 www sungrowpower com Sungrow Power Supply Co Ltd...