![Suez Sievers UPW Boron Analyzer Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/suez/sievers-upw-boron-analyzer/sievers-upw-boron-analyzer_operation-and-maintenance-manual_1389722031.webp)
SUEZ © 2018
DLM 71000-03 EN
Rev. B
Chapter 3: Installation
Power Requirements
•
(100-230) VAC ±10%
•
50/60 Hz
•
80 Watts
•
Protective earth ground incorporated into the main supply power cord
Tools Required
•
4 and 6-mm Allen wrenches
•
KimWipes
®
or equivalent tissue
•
Insulated needle-nose pliers
•
Multimeter
•
Large Phillips screwdriver (used for mounting Analyzer to the wall)
•
Plastic tubing cutter—included (used to prepare sample lines and drain lines)
•
9/16 and 3/4-inch open-end wrenches (used to install sample line filters)
•
Small flathead screwdriver (used to wire I/O terminal blocks)
•
Water-dampened towels (may be needed to clean area after reagent fill)
•
ESD wrist strap
Unpacking the Analyzer
Note:
Although reasonable safeguards against shipping damage have been taken and
the Analyzer is fully insured, product damage may occur from excessive
mishandling. If damage has occurred during shipment, contact Technical
Support or your local service provider.
Note:
Lifting or carrying the Analyzer should be done with two people handling the unit
by the metal enclosure only.
Note:
Save the shipping carton and packing materials that came with the Analyzer. If,
for any reason, the Analyzer must be returned to the factory, it must be packed
in the original carton to ensure that no damage occurs during shipment. There is
a charge for new packaging materials to return the Analyzer.
Содержание Sievers UPW Boron Analyzer
Страница 4: ...SUEZ 2018 4 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 16: ...SUEZ 2018 16 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 24: ...SUEZ 2018 24 of 104 DLM 71000 03 EN Rev B Chapter 1 Introduction THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 64: ...SUEZ 2018 64 of 104 DLM 71000 03 EN Rev B Chapter 5 System Configuration THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 96: ...SUEZ 2018 96 of 104 DLM 71000 03 EN Rev B Chapter 8 Maintenance THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 100: ...SUEZ 2018 100 of 104 DLM 71000 03 EN Rev B Chapter 9 Message and Error Codes THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 103: ...Notes SUEZ 2018 103 of 104 DLM 71000 03 EN Rev B 104...
Страница 104: ...Notes SUEZ 2018 104 of 104 DLM 71000 03 EN Rev B 104...