![Stryker MMP200 Скачать руководство пользователя страница 72](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968072.webp)
72
S
12. Installing Covers
12.1 Lights and Flat Panel Suspension
1. Loosen the reducing ring and lower it until it rests on the upper Suspension Arm.
2. Assemble the two halves of the ceiling cover around the down tube above the reducing ring.
3. Install the ceiling gasket cover and around the top edge of the ceiling cover
4. Raise the ceiling cover and secure to the four threaded rods with the supplied screws.
5. Slide the reducing ring up to the ceiling cover and tighten.
Warning
Failure to properly attach the ceiling cover may result in the ceiling cover
falling during use!
12.2 Booms
Round, Single Suspension Ceiling Cover
1. Install the four threaded rods into the
Mounting (Interface) Plate
2. Use one-half of the ceiling cover as a guide
to adjust the height of the four threaded
rods. Tighten jam nuts against ceiling plate
to secure rods in place.
3. Attach the ceiling cover to the four thread-
ed rods with the supplied cosmetic screws.
4. Assemble two halves of the ceiling cover
with remaining cosmetic screws.
Low Profile Single Suspension Ceiling Cover
Содержание MMP200
Страница 2: ......
Страница 4: ......
Страница 68: ...68 S 5 Ensure that the cover 5 and the retaining screws 4 are fixed securely Adjusting the Mounting Flange ...
Страница 106: ...106 S Front View of Connector ...
Страница 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Страница 140: ...140 S 18 Servicing the LED Refer to Visum LED Surgical Lights Service Manual 1004400195 for servicing instructions ...
Страница 148: ...148 S ...
Страница 149: ...Stryker Communications 1410 Lakeside Pkwy Flower Mound TX 75028 t 972 410 7100 www stryker com ...