![Stryker MMP200 Скачать руководство пользователя страница 17](http://html.mh-extra.com/html/stryker/mmp200/mmp200_installation-and-service-manual_1385968017.webp)
17
S
If any parts are missing, contact the Shipping and Receiving Department to verify whether a shipping
box(es) was left behind. If all boxes were delivered and parts are unaccounted for, call and inform your
Project Manager of the missing items.
Use box cutters to open the shipping box along the seams.
Note
Notice that the boxes have “break away” panels to allow easy access to the parts.
Verify that all parts are present and visibly undamaged.
4.3
Flat Panel Arms
The equipment will arrive in a shipping box on one pallet. The shipping box should contain the Flat
Panel Arm System and Ceiling Covers.
The Flat Panel Arm will be fully assembled and completely wired out of the crate. Uncrate pallet and
open the shipping box.
Use box cutters to open the shipping box along the seams.
Verify that all parts are present and visibly undamaged.
4.4 Booms
Each Boom will arrive in a shipping box on one pallet. The shipping box should contain a Boom Arm,
Service Head, shelves (if applicable), and Ceiling Covers.
Use box cutters to open the shipping box along the seams.
Verify that all parts are present and visibly undamaged.
Содержание MMP200
Страница 2: ......
Страница 4: ......
Страница 68: ...68 S 5 Ensure that the cover 5 and the retaining screws 4 are fixed securely Adjusting the Mounting Flange ...
Страница 106: ...106 S Front View of Connector ...
Страница 125: ... 125 S Schematics of Bladder Installation at Bearing 2 Raceway ...
Страница 140: ...140 S 18 Servicing the LED Refer to Visum LED Surgical Lights Service Manual 1004400195 for servicing instructions ...
Страница 148: ...148 S ...
Страница 149: ...Stryker Communications 1410 Lakeside Pkwy Flower Mound TX 75028 t 972 410 7100 www stryker com ...