5.
INSTALLATION OF THE S-CB Px 120
5.1.
General notes
At both sides of the boiler at least 50 mm of clearance should be applied to walls or wall units, 350 mm above the
top side of the boiler and enough distance from the bottom side of the boiler, so that the pump can be mounted
here.
The installation area/room must have the following provisions:
•
230 V - 50 Hz power source socket with earth connection.
•
Open connection to the sewer system for draining condensing water.
•
A sound-deadening wall.
•
The wall used for mounting the boiler must be able to hold the weight of the boiler.
Other considerations related to the boiler location.
•
The ventilation of the boiler room must meet all applicable standards and regulations, regardless of the se-
lected supply of fresh air to the boiler location.
•
Both the air supply and the flue gas tubes must be connected to the outside wall and/or the outside roof.
•
The installation area must be dry and frost-free.
•
The boiler has a built-in fan that will generate noise, depending on the total heat demand. The boiler location
should minimise any disturbance this might cause. Preferably mount the boiler on a brick wall.
•
There must be sufficient lighting available in the boiler room to work safely on the boiler.
•
When a boiler is positioned at the highest point of the installation, the supply and return pipes must first pro-
trude 0.5 m above the top of the boiler, before these pipes go to the installation side. In other words, the water
level must always be 0.5 meter above the top of the boiler and an automatic air vent must be installed in the
supply or return pipe. A low-water level protection should also be installed at the installation side.
•
Notice the positioning of electrical components in relation to the temperature sensitivity.
•
Make sure there is an open connection with the sewer to drain the condensate. This connection should be
lower than the condensate drain level of the boiler:
←
Apply an open connection to the sewer
The boiler must be positioned and installed by a skilled installer in accordance with all applicable standards and
regulations. Commissioning the boiler must be done by a skilled service/commissioning engineer, who is trained
for this type of boiler.
Содержание S-CB Px 120
Страница 2: ...S CB Px 120 Manual 2 ...
Страница 6: ...S CB Px 120 Manual 6 ...
Страница 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Страница 34: ...S CB Px 120 Manual 34 ...
Страница 111: ...S CB Px 120 Manual 111 ...
Страница 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Страница 116: ......
Страница 117: ......