6.
BOILER CONNECTIONS
6.1.
General
1 - Flow CH
2 - Return CH
3 - Siphon cleaning point
4 - Condensate drain
5 - Gas
6.1.1.
M
OUNTING
When mounting the connections, always make
sure that no extra tension, forces and/or tor-
ques are applied to the connecting pipes
and/or the boiler and the boiler suspension.
Keep the connections fixed in place, as shown
in the picture, by using two wrenches.
6.1.2.
G
AS CONNECTION
Always install a manual shutter valve in the gas supply line, directly underneath the boiler.
NOTICE: This valve is NOT delivered with the boiler.
2
1
5
4
3
Содержание S-CB Px 120
Страница 2: ...S CB Px 120 Manual 2 ...
Страница 6: ...S CB Px 120 Manual 6 ...
Страница 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Страница 34: ...S CB Px 120 Manual 34 ...
Страница 111: ...S CB Px 120 Manual 111 ...
Страница 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Страница 116: ......
Страница 117: ......