S-CB Px 120 Manual
105
System type 4
System 4
Name
Wire terminal
Order nr.
P1
Boiler pump
P3
Optional heating pump
25-26-27
RT
Modulating room unit
with timer
13-14
E04.016.355
T
Calorifier
ST
Calorifier thermostat
or tank sensor
5-6
E04.016.303
OS
Outside temperature
Sensor
1-2
E04.016.585
DV
Diverter valve
(3-way-valve)
28-29-30-31
Parameter change required
A
= boiler
= heating zone
System type 5
System 5
Name
Wire terminal
Order nr.
P1
Boiler pump
P3
Optional heating pump
25-26-27
RT
Modulating room unit
with timer
13-14
E04.016.355
T
Calorifier tank
ST
Calorifier thermostat
or tank sensor
5-6
E04.016.303
P2
DHW primary pump
29-30-31
OS
Outside temperature
sensor
1-2
E04.016.585
SNV
Non return valve
Parameter change required
A
= boiler
= heating zone
System type 6
System 6
Name
Wire terminal
Order nr.
P1
Boiler pump
P3
Optional heating pump
25-26-27
RT
Modulating room unit with
timer
13-14
E04.016.355
FS
Flow temperature sensor
3-4
E04.016.304
OH
Low loss header
OS
Outside temperature sen-
sor
1-2
E04.016.585
No
parameter change required
A
= boiler
= heating zone
Содержание S-CB Px 120
Страница 2: ...S CB Px 120 Manual 2 ...
Страница 6: ...S CB Px 120 Manual 6 ...
Страница 33: ...S CB Px 120 Manual 33 9 4 Electrical schematics ...
Страница 34: ...S CB Px 120 Manual 34 ...
Страница 111: ...S CB Px 120 Manual 111 ...
Страница 115: ...S CB Px 120 Manual 115 weather dependent control 49 73 ...
Страница 116: ......
Страница 117: ......