Chapter 5. Removal and Replacement
EK–MOL80–SV. B01
5–31
Figure 5–35 Pivoting The Tensioner Lever To Release Tension
4.
Release the tension on the rear rope tensioner (drive rope). Grip the rope ten-
sioner plastic section with one hand and pull back the metal section with
your other hand to release the metal securing tab seated in the plastic sec-
tion. The metal section will swing out and off pivoting pegs on the plastic
section.
5.
Take the drive rope off the top two pulleys.
6.
Unhook the rope tensioner spring from drive rope end and remove the drive
rope end from the rope tensioner.
7.
Remove the other end of the drive rope from the rope tensioner. The drive
rope will now hang loose except for where it is connected to the rope coupler
8.
Remove one T-15 screw from the rope coupler cover.
Содержание RW551
Страница 27: ...Medium Optical Disk RW551 RW552 Library 3 2 EK MOL80 SV B01 Figure 3 2 Rear Panel SCSI Connect...
Страница 34: ...Chapter 3 Product Configuration and Operation EK MOL80 SV B01 3 9 Figure 3 4 Control Panel Menu Tree...
Страница 92: ...end...
Страница 139: ...Chapter 5 Removal and Replacement EK MOL80 SV B01 5 47 Figure 5 49 Jukebox Exploded View 1 of 2...
Страница 140: ...Medium Optical Disk RW551 RW552 Library 5 48 EK MOL80 SV B01 Figure 5 49 Jukebox Exploded View 2 of 2...
Страница 141: ...Chapter 5 Removal and Replacement EK MOL80 SV B01 5 49 Figure 5 50 Jukebox Power Harness...
Страница 142: ...Medium Optical Disk RW551 RW552 Library 5 50 EK MOL80 SV B01 Figure 5 51 Jukebox Pulley and Rope Diagram...
Страница 166: ...Chapter 6 Theory of Operation EK MOL80 SV B01 6 23 Figure 6 10 User Zone Layout for 1 3 Gbyte Media g 1...
Страница 167: ...Medium Optical Disk RW551 RW552 Library 6 24 EK MOL80 SV B01 Figure 6 11 User Zone Layout for 1 3 Gbyte g 16...
Страница 168: ...Chapter 6 Theory of Operation EK MOL80 SV B01 6 25 Figure 6 12 User Zone Layout for 2 6 Gbyte Media 1 024 bytes sector...