
®
6 Operation
Fritz Stephan GmbH
GA-070T-0518V2.7-HAO-EN
125
6
Operation
6.1
Test before every start-up
All tests must be carried out before the device is used. The staff carrying
out the tests must be well acquainted with the operating manual.
6.1.1
Testing requirements
The last safety check must have been carried out as scheduled. Visual
check of the safety check sticker.
The device is completely assembled and connected.
The internal battery must be fully charged.
DANGER
Never operate device if it has failed one of the tests!
Содержание EVETR
Страница 1: ...EVETR Transport Ventilator Instructions for use...
Страница 32: ......
Страница 40: ......
Страница 86: ......
Страница 106: ......
Страница 124: ......
Страница 192: ......
Страница 194: ...9 Functional description 194 GA 070T 0518V2 7 HAO EN Fritz Stephan GmbH Fig 108 EVETR pneumatics design...
Страница 210: ......
Страница 234: ......
Страница 240: ......
Страница 246: ......
Страница 253: ...17 Notes Fritz Stephan GmbH GA 070T 0518V2 7 HAO EN 253 17 Notes...