47
Power ON/OFF
Cha
p
te
r 2
Us
er
Gu
ide -
R
2
2
0
During the initial start up of
the Auditorium Unit the
Power Sequence Progress
message appears, and the
GREEN Status Indicator
lamp is flashing.
If the Projector MAIN circuit breaker has been set to OFF,
an information message is displayed. Tap YES to
acknowledge the message and continue the start up
process. When the start up has completed the RED Status
Lamp will be flashing indicating that the Cavity Security
System must be reset (and the KDMs reloaded).
At this point the RAID, Media Block, SMS Server and the
Projector are operating normally. However, if errors
occurred during the start up sequence, Login to the
Projectionist Terminal to access this additional
information.
Note:
The Projector remains in STANDBY mode and the
Lamp is
not
illuminated even if the LAMP circuit breaker
is set to ON.
You
must
Login to the SMS Controller to Initialize the
Cavity Security System and reload the KDM(s)
appropriate to the DCP content present on the RAID.
Power Up
During hours where the theater is not operating, the
Auditorium Unit is Shutdown and, in many cases, MAINS
A/C is switched OFF at a circuit breaker panel. Once the
MAINS A/C is restored and the initial start-up sequence
has completed, the Welcome screen appears but the Status
Indicator Lamp remains off.
To return the Auditorium Unit to an operational state, tap
the
Power ON/OFF
button on the Projectionist Terminal
Welcome screen.
The Power Up confirmation
message appears on the
Projectionist Terminal. Tap
YES
to continue or
NO
to
abandon the Power Up
process.
During the Wakeup process the GREEN Status Indicator is
flashing and the Power Resume Progress message appears.
When the Power Up process
has completed the Welcome
screen reappears and the
RED Status Lamp will be
flashing indicating that the
Cavity Security System must
be reset and the KDMs
reloaded from the SMS Controller.
Login to the Projectionist Terminal and review the various
status screens.
Note:
The Projector remains in STANDBY mode and the
Lamp is
not
illuminated even if the LAMP circuit breaker
is set to ON.
You
must
Login to the SMS Controller to Initialize the
Cavity Security System and reload the KDM(s)
appropriate to the DCP content present on the RAID.
Shutdown
While the Auditorium Unit can be transitioned directly
from the Operational state to Shutdown it is recommended
that you first stop the current presentation and place the
system in STANDBY from the Projector Control screen.
The Shutdown process takes a few minutes due to the
sequenced shutdown process required for the RAID and
the Media Block which is followed by a Shutdown of the
SMS Server.
Caution:
Even though the shutdown process has
completed DO NOT remove MAINS (A/C) Power from
the system for a period of 30 minutes to allow for proper
cooling of the Lamp and system components.
To access the Power ON/OFF button you must logout on
the Projectionist Terminal.
Tap
Menu
and then tap
Logout
.
Power ON/OFF
Содержание LSM-100
Страница 27: ...23 Power ON OFF Chapter 1 User Guide R110 ...
Страница 53: ...Sony Corporation ...